1. The operator must understand the general characteristics and structure of the machine and equipment. 2. Before starting, check whether the standards in the work meet the requirements of powder spraying according to the regulations. Check whether the gas barometer is above or below 0.5Mpa: Check whether the grounding device of the electrostatic generator control cabinet is reliable. 3, turn on the main power supply, the power display light: turn on the centrifugal fan knob switch, air filter knob switch, upwind flip knob switch. 4, the electrostatic spraying work standard voltage slow to 50KV-80KV up and down, generally operated in the middle of 60-70KV, it is forbidden to adjust the static electricity to too high. 5, the gun nozzle does not have to be too close to the workpiece, let alone touch the potential difference electric conductor. The distance between the powder gun and the workpiece is generally adjusted to the middle of 15-30 cm. According to the actual spray paint quality, adjust the main parameters of each processing technology. Do not use electrostatic duster to turn the workpiece.
6, pay attention to the spray room should not be too much powder fog and accumulation of powder. If found immediately to find out the reason, carry out regular inspection and maintenance. 7. When the work is completed or the materials are stopped, adjust the current and voltage of the electrostatic generation control cabinet to '0', turn off the control power supply, turn off the pressure valve, clean up the working environment, place the electrostatic accessories neatly, and then turn off the centrifugal fan power supply and the total power supply after cleaning the powder in the spray chamber. There are 30 standards for occupational safety and health in painting operations, and the specific list is as follows: No. Standard No. Standard Name 1GB7691-2003 General Rules for Safety Management 2GB7692-2012 Safety of pre-paint treatment process and ventilation purification 3GB12367-2006 Safety of electrostatic spray painting process 4GB12942-2006 Safety technical requirements for limited space operation 5GB/T14441-2008 Terminology 6GB14443-2007 Coating drying room safety technical regulations 7GB14444-2006 Painting room safety technical regulations 8GB14773-2007 Electrostatic spray gun and its auxiliary devices Safety technical conditions 9GB15607-2008 powder electrostatic spraying process safety 10GB17750-2012 Dip coating process safety 11GB6514-2008 Paint process safety and ventilation purification 12GB20101-2006 Organic waste gas purification device safety technical regulations 13GB/T4054-2008 Coating marking 14AQ5201-2007 Painting engineering safety facilities acceptance specifications 15AQ5202-2008 electroplating production safety operating rules 16AQ5203-2008 electroplating production equipment safety technical conditions 17AQ5204-2008 Paint production enterprise safety technical rules 18AQ5205-2008 Safety Specifications for painting and painting work 19AQ5206-2011 Guidelines for Safety Evaluation of painting projects 20AQ/T5207-2011 Requirements for accident emergency rescue plan preparation for painting enterprises 21AQ5208-2011 General requirements for occupational health and safety of painting 22AQ/T5209-2011 Classification of dangerous and harmful factors in painting operation 23AQ5210-2011 General Rules for building painting safety 24AQ5211-2011 Safety technical conditions for arc thermal spraying equipment 25AQ5212-2011 Safety performance testing requirements and methods for ventilation and purification equipment 26AQ5213-2011 Safety regulations for flake zinc (aluminum) powder/anticorrosive coating operation 27AQ5214-2013 Testing method for safety performance of drying equipment 28AQ5215-2013 Testing method for safety performance of spray booth 29AQ5216-2013 General Rules for Safety Use of coatings and auxiliary materials 30AQ5217-2015

Pub Time : 2025-02-21 08:52:53 >> News list
Contact Details
Hangzhou Huaxiang Coating Equipment Co., Ltd.

Contact Person: Mr. Ge

Tel: 13335812068

Send your inquiry directly to us (0 / 3000)